Table of Contents
Executive Summary

        PROJECT BACKGROUND S-1
        PROJECT ALTERNATIVES S-2
                 Alternative A S-2
                         Environmental Impacts S-3
                         Expansion Potential S-5
                         Wind Coverage S-5
                         Proximity to Noise Sensitive Areas S-5
                         Airspace S-5
                         Runway Protection Zones S-5
                Alternative F S-6
                         Environmental Impacts S-6
                         Expansion Potential S-6
                         Wind Coverage S-6
                         Proximity to Noise Sensitive Areas S-8
                         Airspace S-8
                         Runway Protection Zones S-8
                Alternative T S-8
                         Environmental Impacts S-8
                         Expansion Potential S-10
                         Wind Coverage S-10
                         Proximity to Noise Sensitive Areas S-10
                         Airspace S-10
                         Runway Protection Zones S-10
                No Build Alternative S-10
RECOMMENDED ACTION S-10

CHAPTER ONE-PURPOSE AND NEED

        INTRODUCTION 1.1
        PROJECT DESCRIPTION 1.1
                Airport Related Development 1-2
                Rail/Inter-Modal Development 1-4
                Business/Commerce Development 1-4
        EXISTING AIRPORT LOCATION AND BACKGROUND 1-5
        PROJECT PURPOSE AND JUSTIFICATION 1-5
                Replacement of Existing Bowling Green-Warren County
                Regional Airport 1-5
                Runway Safety Area (RSA) 1-7
                Incompatible Land Uses in Runway Protection Zones 1-9
                Limited Runway Extension Capability 1-10
                         Commercial Aircraft 1-10
                         General Aviation Aircraft 1-11
                         Runway Length Summary 1-11
                Noise Impacts 1-12
                Economic Development 1-13
                Purpose and Need Summary 1-14
        ENVIRONMENTAL ASSESSMENT REQUIREMENTS 1-16

CHAPTER TWO-ALTERNATIVES

        SUMMARY OF SITE SELECTION PROCESS 2-1
                Preliminary Site Evaluation 2-1
                         Topographical Features 2-4
                         Rail Access 2-4
                         Highway Access 2-4
                         In-Place Development Constraints 2-4
                         Proximity to Incorporated Residential Areas 2-4
                         Alvaton Area 2-6
                         Hadley Area 2-6
                         101/Pondsville Area 2-6
                         Interstate 65 (I-65)/Cumberland Parkway Area 2-6
                         Oakland/Smiths Grove Area 2-6
                         South Union Area 2-6
                         Woodburn Area 2-6
                Site Selection: Phase I 2-6
                Results of Initial Site Area Review 2-7
                         Alvaton Area 2-7
                         Hadley Area 2-7
                         KY 101/Pondsville Area 2-7
                         Bowling Green-Warren County Regional Airport 2-7
                Site Selection: Phase II 2-8
                Yellow Study Area Evaluation 2-12
        PUBLIC AND AGENCY COORDINATION DURING THE SITE SELECTION PROCESS 2-12
        AIRPORT DEVELOPMENT ALTERNATIVES 2-12
                Alternative A 2-14
                Alternative F 2-14
                Alternative T 2-17
                No Build Alternative 2-17
        POTENTIAL IMPACTS 2-17
        APPLICABLE LAWS, REGULATIONS AND PERMITS 2-20

CHAPTER THREE-AFFECTED ENVIRONMENT

        DESCRIPTION OF AFFECTED ENVIRONMENT 3-1
                Location of Study Area 3-1
                Existing Land Use 3-1
                Existing Zoning 3-1
                Future Land Use 3-4
                Community/Man-Made Features 3-4
                Socioeconomic Characteristics of the Study Area 3-7
                         Demographic Trends 3-7
                                 Primary Market Area 3-7
                                         Yellow Study Area 3-8
                                 Economic Characteristics 3-8
                Natural Resource Characteristics of the Study Area 3-11
                         Regional Geology 3-11
                         Geology of the Yellow Study Area 3-11
                         Soils 3-13
                         Air Quality 3-13
                         Water Quality 3-13
                         DOT Section 4(f) Lands 3-16
                         Mammoth Cave National Park 3-16
                         Bristow Community Park 3-16
                         Ephram White Park (proposed) 3-18
                         Oakland Elementary School 3-18
                         Culural Resources 3-18
                         Biotic Commnities 3-18
                         Biotic Communities (Flora) 3-18
                         Biotic Communities (Fauna) 3-21
                         Threatened and Endangered Species of Flora and Fauna 3-21
                         Wetlands 3-22
                         Prime and Unique Farmlands 3-23
                         Any Contemplated Future Actions 3-23
                Future Planning Activities 3-24
                         Future Highway Development Activities 3-26

CHAPTER FOUR-ENVIRONMENTAL CONSEQUENCES

        ALTERNATIVE A 4-1
        ALTERNATIVE F 4-1
        ALTERNATIVE T 4-1
        NO BUILD ALTERNATIVE 4-1
        NOISE 4-2
                Physics and Measurement of Noise 4-3
                Use of DNL as Standard Descriptor for Aviation Noise 4-4
                Noise Contour Generation 4-4
                Noise Modeling Assumptions 4-6
                Noise Impacts 4-6
                         Build Alternatives 4-6
                         No Build Alternative 4-10
                Noise Impacts (Construction-Related) 4-10
        COMPATIBLE LAND USE 4-10
                Build Alternatives 4-10
                No Build Alternatives 4-10
        SOCIAL IMPACTS/ENVIRONMENTAL JUSTICE 4-13
                Social Impacts 4-13
                         Relocation of Business or Residences 4-13
                                 Build Alternatives 4-13
                                 Business/Commerce Park Impacts 4-14
                                 No Build Alternative 4-14
                         Alteration of Surface Transportation Patterns 4-14
                                 Build Alternatives 4-14
                                 No Build Alternatives 4-14
                                 Business/Commerce Park 4-15
                         Disruption of Established Communities 4-15
                                 Build Alternatives 4-15
                Alternative A 4-15
                Alternative F 4-15
                Alternative T 4-16
                No Build Alternative 4-16
                Business/Commerce Park 4-16
                         Disruption of Orderly, Planned Development 4-16
                                 Build Alternatives and Business/Commerce Park 4-16
                                 No Build Alternative 4-17
                         Changes in Employment 4-17
                                 Build Alternatives 4-17
                                 No Build Alternative 4-17
                                 Business/Commerce Park 4-17
                Environmental Justice 4-18
                         Build Alternatives and Business/Commerce Park 4-18
                         No Build Alternative 4-19
        INDUCED SOCIOECONOMIC IMPACTS/SECONDARY AND CUMULATIVE IMPACTS 4-20
                Shifts in Patterns of Population Movement 4-20
                         Build Alternatives 4-20
                         Business/Commerce Park 4-20
                         No Build Alternative 4-21
                Changes in Public Service Demands 4-21
                         Build Alternatives and Business/Commerce Park 4-21
                         No Build Alternative 4-21
                Changes in Business and Economic Activity 4-21
                         Build Alternatives 4-21
                         No Build Alternative 4-22
                         Business/Commerce Park 4-22
        AIR QUALITY 4-22
                Build Alternatives 4-23
                         No Build Alternative 4-23
                         Business/Commerce Park 4-23
                Air Quality Construction Impacts 4-24
                         Build Alternatives and Business/Commerce Park 4-24
                         No Build Alternative 4-24
        WATER QUALITY/WATER SUPPLY 4-24
                Water Quality 4-24
                         Build Alternatives and Business/Commerce Park 4-25
                         Wastewater 4-26
                Water Supply 4-27
                         Build Alternatives and Business/Commerce Park 4-27
                         No Build Alternative 4-27
        DEPARTMENT OF TRANSPORTATION SECTION 4(F) LANDS 4-28
                Build Alternatives and Business/Commerce Park 4-28
                Mammoth Cave National Park 4-28
                Bristow Community Park 4-29
                Ephram White Park (proposed) 4-29
                Oakland Elementary School Recreation Fields 4-29
                         No Build Alternative 4-30
        HISTORICAL ARCHAEOLOGICAL AND CULTURAL RESOURCES 4-30
                Build Alternatives 4-30
                Business/Commerce Park 4-31
                No Build Alternative 4-35
        BIOTIC COMMUNITIES 4-35
                Impacts to Faunal Biotic Communities 4-35
                         Build Alternatives/Commerce and Industrial Park 4-35
                         No Build Alternative 4-35
                Impacts to Flora Biotic Communities 4-35
                         Build Alternatives and Business/Commerce Park 4-35
                         No Build Alternative 4-36
        ENDANGERED AND THREATENED SPECIES OF FLORA AND FAUNA 4-36
                Build Alternatives and Business/Commerce Park 4-37
                         Kentucky Cave Shrimp 4-37
                                 Impacts and Mitigation 4-38
                         Blind Cave Crayfish 4-40
                                 Impacts and Mitigation 4-40
                         Endangered Bats 4-40
                                 Impacts and Mitigation 4-41
                         Eggert's Sunflower 4-41
                                 Impacts and Mitigation 4-42
                         Remaining Listed Species 4-42
                         No Build Alternative 4-43
        WETLANDS 4-43
                Build Alternatives and Business/Commerce Park 4-43
                No Build Alternative 4-43
        FLOODPLAINS 4-44
                Build Alternatives and Business/Commerce Park 4-44
                No Build Alternative 4-44
        COASTAL ZONE MANAGEMENT 4-44
        COASTAL BARRIERS 4-44
        WILD AND SCENIC RIVERS 4-45
                Build Alternative and Business/Commerce Park 4-45
                No Build Alternative 4-45
        FARMLANDS 4-45
                Build Alternatives 4-46
                         Alternative A 4-46
                         Alternative F 4-47
                         Alternative T 4-47
                No Build Alternative 4-48
                Business/Commerce Park 4-48
        ENERGY SUPPLY AND NATURAL RESOURCES 4-49
                Build Alternatives and Business/Commerce Park 4-49
                No Build Alternative 4-49
        LIGHT EMISSIONS 4-49
                Build Alternatives 4-50
                No Build Alternative 4-50
        SOLID WASTE IMPACTS 4-50
                Solid Waste Generation 4-50
                         Build Alternatives 4-50
                         No Build Alternative 4-50
                         Business/Commerce Park 4-51
                Waste Disposal Facilities 4-51
                         Build Alternatives 4-51
                         No Build Alternative 4-51
                         Business/Commerce Park 4-51
        CONSTRUCTION IMPACTS 4-52
                Build Alternatives and Commerce and Business Park 4-52
                         Environmental Issues 4-52
                         Engineering Design 4-53
                         Construction 4-53
                         Alternative A 4-53
                         Alternative F 4-53
                         Alternative T 4-54
                Construction Impacts: Mitigation 4-54
                         Surface and Subsurface Drainage Control 4-54
                         Earthwork and Site Grading 4-56
                         Foundation Support and Settlement 4-56
                         Blasting 4-59
        UTILITY IMPACTS 4-59
        PRELIMINARY EVALUATION OF ALTERNATIVE RUNWAY
        LAYOUTS 4-59
        EVALUATION OF ALTERNATIVES 4-60
                Expansion Potential 4-60
                Alternative A 4-60
                Alternative F 4-60
                Alternative T 4-60
        WIND COVERAGE 4-60
                Proximity to Noise Sensitive Areas 4-61
                Alternative A 4-61
                Alternative F 4-61
                Alternative T 4-61
                Airspace 4-61
                Runway Protection Zones 4-61
                Alternative A 4-62
                Alternative F 4-62
                Alternative T 4-62

CHAPTER FIVE- ENVIRONMENTAL CONSEQUENCE/OTHER CONSIDERATIONS

        POSSIBLE CONFLICTS BETWEEN THE PROPOSED ACTION AND APPLICABLE GOVERNMENTAL OBJECTIVES 5-1
        INCONSISTENCY WITH APPROVED STATE OR LOCAL PLANS OR LAWS 5-1
        MEANS TO MITIGATE ADVERSE ENVIRONMENTAL IMPACTS 5-2
                Secondary/Cumulative Impacts 5-2
                         Relocations 5-2
                Construction-Related Air Quality Impacts 5-3
                Construction-Related Noise Impacts 5-3
                Water Quality/Water Supply 5-4
                         Water Quality 5-4
                         Wastewater 5-5
                         Water Supply 5-5
                Cultural Resources 5-6
                Threatened and Endangered Species 5-7
                         Kentucky Cave Shrimp and Blind Cave Crayfish 5-7
                         Spill Prevention 5-7
                         Collection of Storm Water Runoff 5-8
                         Eggert's Sunflower 5-8
                Farmlands 5-8
                Construction Impacts 5-9
                         Surface and Subsurface Drainage Control 5-9
                         Earthwork and Site Grading 5-10
                         Foundation Support and Settlement 5-10
                         Blasting 5-10
        DEGREE OF CONTROVERSY ON ENVIRONMENTAL GROUNDS 5-11


Executive Summary