Available Sites/Tracts/Locations
The primary site will be located approximately 5 miles Northeast
of Bowling Green adjacent to I-65, the CSX Railroad and US 31-W.
County: Warren
Reference City: Bowling Green
School District: Warren County
Location: Bowling Green City Limits
Zoning: Planned Unit Development/Light Industrial/Heavy Industrial
Highway Access: US 31W passes through northern portion of
site; US 68 passes through southern portion of site; I-65 interchange
0.9 mile east via US 68; New Access Interchange on I-65 planned.
International Air Access: Nashville International Airport Distance: 69 miles south of site
Local Air Cargo Access: Warren County Regional Airport
Railroad: CSX passes through the site
Flood Data: Not in 100-year flood plain
Ownership: Inter-Modal Transportation Authority (ITA); Optioned
by ITA; and Private
Price Per Acre: $35,000; Rail Served $45,000; Negotiated with
ITA Water: Warren County Water District
Current Line Size: 8-inch along US 68
Designed Line Size: 20-inch
System Information (gallons per day): Warren County Water District Treatment Capacity: 30,000,000
Average Daily Use: 16,767,938
Excess Capacity: 13,232,062
Sewer: Warren County Water District-Sewer Division
Current Line Size: 8-inch force main line along US 68
Designed Line Size: 20-inch
System Information (gallons per day): Warren County Water District-Sewer Division
Treatment Capacity: 10,600,000
Average Daily Flow: 7,442,000
Excess Capacity: 3,158,000
Natural Gas: Atmos Energy
Size Line: 8-inch transmission line runs through northern portion
of site; 4-inch distribution line 3,500 feet southwest of site
Electricity: Warren RECC
Available through 69 KV and 161 KV transmission lines
Telecommunications: T-1 up to DS3 levels of service available on site
Fire Protection: 1,000,000 gallon elevated storage tank
|